

Hutton Close, Crowther Ind Est, Washington, Tyne & Wear NE38 0AH, England
Email: enquiry@isocomoptocouplers.com - Tel: +44 (0)191 4166546 - Fax: +44 (0)191 4155055
Test Flow for Standard Mil. Temp. Product
Test Flow for BS9400/L2 Screened Product
Screening Details in Full
High Reliability Ceramic Optocoupler Selection Guide
Optocouplers and Optoelectronic Catalogue
Home Page
| TEST | BS9400 PARA | CONDITIONS |
| 100% Pre-Cap Visual Inspection | BS9400 1.2.10 |
|
| Lid Seal |
|
|
| Temp. Cycle | BS9400 1.2.6.13 | 10 Cycles -65°C/+150°C |
| Fine Leak Test | BS9400 1.2.6.14 (Qk) |
|
| Gross Leak Test | BS9400 1.2.6.14 (Qc) |
|
| 100% Visual Inspection |
|
|
| 100% D.C. Test |
| 125°C |
| 100% Switching Time Test |
| 25°C |
| 100% Isolation Test |
| 25°C |
| Sample (ILII 0.65% AQL) DC Test |
| -55°C |
| 100% DC Test |
| 25°C |
| Q.A. Release |
|
|
| TEST | BS9400 PARA | CONDITIONS |
| 100% Pre-Cap Visual Inspection | BS9400 1.2.10 |
|
| Lid Seal |
|
|
| Stabilisation Bake | BS9400 1.2.6.3 | 150°C, 24 hrs |
| Temp. Cycle | BS9400 1.2.6.13 | 10 Cycles -65°C/+150°C |
| Acceleration | BS9400 1.2.6.9 | 49000 m/s2, Y1 |
| Fine Leak Test | BS9400 1.2.6.14 (Qk) |
|
| Gross Leak Test | BS9400 1.2.6.14 (Qc) |
|
| 100% D.C. Test Pre-Burn-in |
| 25°C |
| Burn-in | BS9400 1.2.9.2 | 160 hrs min, 125°C |
| 100% D.C. Test Post-Burn-in |
| 25°C |
| 100% Switching Time |
| Test 25°C |
| 100% Isolation Test |
| 25°C |
| 100% D.C. Test |
| 125°C |
| 100% D.C. Test |
| -55°C |
| 100% Visual Inspection |
|
|
| Q.A. Release |
|
|
Screening Details in Full
Contents